Tekom: premium construction and finishing works, Stara Zagora
Eye clinic in the 1929 “Green Bath”
Stara Zagora · 2025
Apartment building with shops and garages
Stara Zagora · 2021Office and retail centre with art gallery
Stara Zagora · 2009
Restored family house in Chepelare
Chepelare · 2004
Golden Fish holiday residences
Chernomorets · 2010St Dimitar chapel, solid brick dome
Stara Zagora · 2011
Family house on a hillside
Ostra Mogila · 2016
Family house with pool
Sulitsa · 2002
Hotel converted to holiday apartments
Ravda · 2013
Offices and printing house
Stara Zagora · 2003
Apartment building with garages and shop
Stara Zagora · 2013
Apartment building with garages
Stara Zagora · 2011
Apartment building above a Roman temple
Stara Zagora · 2006
Apartment building with shared courtyard
Stara Zagora · 2005
Apartment building with garages and shops
Stara Zagora · 2001
Homes, shops and a medical centre
Stara Zagora · 2003
Public pool, 500 m³
Stara Zagora · 2001
Modern facade for the Kalia apartment building
Stara Zagora · 2021Build it right. Take the risk out.
Most building problems start as small shortcuts nobody sees. We work so that nothing on your site goes unseen.
- A price you can plan onQuantities taken from the drawings and agreed before work starts, not discovered on site.
- Done the right wayEvery layer to the manufacturer's system and Bulgarian standards, with materials you can trace.
- Nothing hiddenDaily photos and protocols of everything that gets covered up: insulation, waterproofing, installations.
- Handover without surprisesSigned off room by room, with documents and warranties in one place.
The people behind the plaster
Our own people, on site and in the office. We tried to take their photo, but they were busy working.
- Foreman22 years at Tekom*
Asked to pose. Checked the plumb line instead.
- Plasterer15 years at Tekom*
Will smile once the plaster dries.
- Insulation11 years at Tekom*
Prefers to be photographed in thermal imaging.
- Painter18 years at Tekom*
Says the wall is the portrait.
- Tiler14 years at Tekom*
Booked for the shoot. Laid 40 m² of tile instead.
- Decorative finishes12 years at Tekom*
Venetian plaster takes seven coats. So does she.
- Site manager25 years at Tekom*
Rescheduled the photo for a concrete pour.
- Mason20 years at Tekom*
Has laid more bricks than he has taken selfies.
- Carpenter, roofs13 years at Tekom*
Measured twice. Still not ready for his close-up.
- Managing director30 years at Tekom*
Signs off every handover. Has not signed off on this photo yet.
- Accountant19 years at Tekom*
Priced the photo shoot to the last cent. Will appear once it is invoiced.
- Design engineer16 years at Tekom*
Drew the group photo to scale. Forgot to draw himself in.
- IT6 years at Tekom*
Says the photo is in the cloud. Nobody has seen the cloud.
For everything else, we rely on our partners
Specialists we have built with for years. We bring them in, coordinate them on your site and answer for the result.
Constructability review
Your drawings checked before anything is built, so problems show up on paper, not on site.
Architecture & interior design
From the first sketch to working drawings and the material schedule.
Structural engineering
Calculations and structural drawings, including for old buildings.
Permits & site supervision
The paperwork from building permit to Act 16, handled.
Surveying
Plots, levels and setting out, measured before we dig.
Electrical
Wiring, panels and lighting, laid before our plaster goes on.
Plumbing & heating
Water, drainage, underfloor heating and gas.
Air conditioning & ventilation
Systems sized for the house, not the catalogue.
Windows & doors
Profiles and glazing fitted into our insulation without thermal bridges.
Kitchens & furniture
Made to measure, after our walls are true and our floors are level.
Energy audit & certificate
The audit and certificate your insulation was built to pass.
Solar panels
Roof-mounted systems, planned with the roof rather than after it.
Landscaping
Gardens, paving and terraces to finish the plot.
Where we have built
Most of our work stands within two kilometres of our office. Tap a pin to open the project.
Materials we build with
Systems from manufacturers who stand behind them, applied the way they specify.







